Every number on this page comes from a written case study or a project our clients would confirm. No estimates, no marketing math. This is the work, counted.
A full RDOF program was drowning in its own tracking. J2 rebuilt the system, recovered the status of all 1,681 permits, and saved the delivery of every node. Inside that same program, we fielded 18 project areas ourselves: 4,651 poles at a 95% success rate. The customer ranked J2 their #1 vendor.
89 route miles of grant-funded hybrid plant across 1,082 poles, fielded and drafted as-built for Alabama's Capital Projects Fund. State requirements were unclear at the start, so J2 set the standard, aligned every party, and closed the whole thing in about a month with two revisions. Selected to continue with Phase 2.
A customer hit their pole-permit due date and discovered pole loading had never been done. J2 fielded all 322 poles, ran full NESC loading analysis, flagged 38 for make-ready, and drafted and submitted every permit package in two weeks, starting from no material list at all. Every single pole was approved.
Nearly 108 route miles of hybrid fiber fielded and surveyed across 1,143 poles and 4,354 passings, spanning two Georgia counties, in 22 calendar days. This is what large-area fielding looks like when the crews, the systems, and the plan all hold.
11 miles of underground fiber serving 582 passings, walked out by a two-person crew, fielded, surveyed, and permitted in 12 days, with zero make-ready and nothing standing between the package and construction. Ready to build, first try.
More documented builds from the production line. Different terrain, different plant, same result: fielded, surveyed, and permitted on schedules measured in days. This grid grows with every job we close.
435 passings. Fielded in a 4-day walkout, closed in 6 days.
249 poles. Fielded, surveyed, and permitted in 15 days.
387 passings. Permitted in 11 days on a 5-day field walkout.
183 passings. Fielded, surveyed, and permitted in 12 days.
217 passings. Fielded, surveyed, and permitted in 12 days.
318 passings, 179 poles. Walked out by a single J2 fielder in 2 days, closed in 4.
Tell us what you're building and we'll show you exactly how J2 would deliver it, documented like everything else we do.