The downtown nobody could permit.
A large build spanning two counties came to us after being kicked back twice. The chokepoint was a downtown where three power companies converge, and every package before ours had tried to force that convergence aerial through some of the worst pole loading conditions there are. No software fixes that. We sat down with the municipalities, met with the power companies, and engineered it the way it should have been done the first time: aerial where aerial made sense, with creative underground and drop work where the three utilities came together. The package cleared, the schedule recovered, and that job earned us a new long-term partner.